Skip to content

Contact · Technical evaluation

Tell us about your tunnel case

Tell us what you need to review and what geometric information is available. The request begins a direct technical review; it does not create an automatic download or activation.

Before we talk

Useful information for understanding the case

You do not need to provide files at this stage. A general description allows us to assess technical fit and agree directly on any later supporting material.

01 · Input

Project type

Mining tunnel, gallery, decline or another underground excavation.

02 · Input

Approximate length

Length of the tunnel section to be reviewed during the evaluation.

03 · Input

Available data

Processed point cloud, model or mesh and its coordinate reference system.

04 · Input

References

Available plans, alignment, chainage and design section for comparison.

05 · Input

Objective

Profiles, as-built versus design, quantity calculations, deliverables or executive review.

Evaluation request

Share only the information required

The form requests contact identification, organization, responsible role and evaluation objective. It does not request tax identifiers, passwords, credentials or file uploads.

How to describe the objective

Where relevant, state the project type, approximate length, available data, references and the result you need to review.

After submission, coordination continues directly. No direct installer link is provided.

Next step

A technical review before defining scope

The conversation confirms compatibility, minimum inputs and review criteria before an evaluation is arranged.

Explore applications by team and the scope of the geometric-control product. Applications · Product.